Residential building, Manastirski livadi-east district


Манастирски ливади 2-1 Манастирски ливади 2-1 Манастирски ливади 2-1


 Compleated Building issued with "use permit"

INVESTOR and CONSTRUCTOR: "CONTRACT CITY LTD."
ARCHITECT: arch. YULIAN SIROMAHOV

The construction is carried out in accordance with:
Research and Design Permit dated March 12, 2009.
Work Projects approved by the Architecture and Public Works Directorate with Sofia Municipality on October 21, 2010.
Construction Permit No. 65/July, 29, 2010.
Construction site opened August, 27, 2010.
Construction Line and Level Protocol dated  August, 27, 2010.
Launch Date (Usage Permit) – January, 2012.

ARCHITECTURAL CONCEPT


APARTMENTS

    *  walls and ceiling - lime-cement plaster, gypsum plastering and all external edges of the wall are protected with inbuilt metal corner strips
    *  floor - cement plaster


STAIRCASE and FLOOR CORRIDORS (common parts)

    * walls and ceiling - lime-cement plaster, gypsum plastering, and mixed (white/color) latex paint
    * luxury lighting implementation
    * floor and staircases - granitogres flooring
    * doors - aluminum
    * parapets - aluminum/inox luxury design project


WINDOWS

    * outside - 5-cell PVC windows from German manufacturer, glazing unit
    * external underwindow panels - finishing
    * entrance doors - solid security apartment doors from "Solid 55"
    * internal apartment doors - interior doors with МDF furnishing panels and luxury decorative plate


ENVIRONMENT

    *  Pavements finishing around the building
    *  entrances to garages and entries finishing

 ENTRANCE LOBBY, SECURITY and GUARD

    * an entrance lobby finishing
    * security guard room with WC
    * restricted regular access

 
CONSTRUCTION

    * traditional monolithic construction: reinforced concrete flat-slabs for the floors, shear walls, without columns

 ROOF

    * flat, exhalation, hydro and thermal proofing
    * Vedag/Villas type vapor, with custom-designed aluminum plating
    * water spouts - powder painted

 FACADES

    * ceramic face-bricks
    * thermal proofing system with 8 cm "EPS-F" plates
    * colored silicon plastering from manufacturer of repute
    * external underwindow panels - finishing together with the РVС windows
    * terrace parapets - aluminum with colored glass part
 
INSTALLATIONS

WATER SUPPLY and SEWERS

    * Water supply system - polypropylene distribution pipes, Individual water-meter provided for every apartment
    * Sewerage - РVС finnishing

POWER SUPPLY

    * Standard-compliant heavy-current installation based on a project approved
    * Power installation finnishing with switches, points, sockets - luxury implementation
    * Individual electricity-meter provided for every apartment

 PHONE, INTERCOM, TV and INTERNET

    * Intercom system in every apartment installed
    * Doorbell, and phone - in every apartment installed
    * Internal wiring for cable TV and Internet - installed

HEATING

    * Central gas-heating distribution system with plate heat exchangers and automatic regulation
    * Aluminum radiators in the apartments with individual temperature control option


ELEVATOR

    * Luxury design, an Italian engine, automatic stops and a frequency regulator for smooth start-up and stopping

Warranty and Servicing:

    * Build construction - 10 Years long
    * Hydro insulation works - 5 Years long
    * All other construction and finishing works - 5 Years long


All warranty periods are defined in accordance with Article 160, Paragraph 4 of the Spatial Development Act, and commence on the date of issue of the Building Usage Permit under Article 160, Paragraph 5 of the SDA.

Drujba

Poligona

Manastirski livadi

poligona

kozlo

Kr vada

stud3

dr 1.3

dr 1.2

dr 1.1

Drujba 1-4 Poligona A Man.livadi 2.1 Poligona B
Kozloduy Krastova vada Studentska 3 Drujba 1-3 Drujba 1-2 Drujba 1-1